During the January 2009 storm, the creek deposited all of this Large Woody Debris (LWD) in front of this foot bridge and directed the creek flow directly into the house. All the LWD was removed and used in the Ivie Project above. KES performed permitting, and debris removal oversight. Vic Hoffman with Silver Lake Timber was the contractor for both projects and did an excellent job.